足球手机比分|明天欧洲杯|大赢家比分-足球比分即时比|受注赛程,篮球比分90vs篮球比分足球比分,中国竞彩网?,14场胜负彩最新对阵表

DC engineering
±500kV Yihua Line anti-dancing renovation project

宜華線.jpg

The ±500kV Yihua HVDC transmission line starts from Yidu Converter Station in Yichang, Hubei province, and ends at Huaxin Converter Station in Shanghai. The total length of the line is 1,075 km, and the transmission capacity is 300 MW, which is the main artery of the three Gorges Project.

電 話
產(chǎn) 品
短 信
聯(lián) 系